2023 Streets Project

The 2023 Street Program will be finalized as part of the  Fiscal Year 2023-2024 Budget Process.  The Village Board is currently considering moving forward with an expanded three year program from 2022 to 2025.  Current street under consideration for the improvement in 2023 include:


Potential Project Locations:

New England Ave - Oakton St to North End

Keeney St – Waukegan Rd to Caldwell Ave

Newland Ave - Cleveland St to Madison St

Newcastle Ave - Cleveland St to Madison St

Madison Street – Waukegan Rd to Caldwell Ave

Here are some additional information for our residents consideration:

What kind of work will be done?

In general, the project will include:

  • Repairs to storm drain inlets and other utilities.
  • Removal of existing sidewalk
  • Installation of new curb & gutter and sidewalk.
  • Removal of all or part of the asphalt pavement.
  • Placement of new asphalt pavement.
  • Restoration.   (Lawn restoration typically includes topsoil and seed).

 

Important Information

The existing roadway section with sidewalk directly adjacent to the roadway is not ideal, accelerates deterioration, and creates drainage issues.

The new roadway section will consist of new curb & gutter (1.5’ wide) and sidewalk (5’ wide)

The improvements will extend approximately 2.5’ behind the existing back of sidewalk.  In general, the right-of-way is approx. 16’ behind the existing back of sidewalk at most locations in the project limits. 

The Village plans to hold an open house this winter in order to discuss the improvements and take questions and comments.  Additional notification will be sent out.

How can I get more information?

For specific questions or issues, please contact:

 Bob Rado, Civil Engineer at:

Village of Niles, Public Works Department

6849 Touhy Avenue, Niles, IL 60714-3174

Phone: (847) 588-7924     Email: rjr@vniles.com


Please check back to this page often for more information as the project design progresses